Rashtriya Rail Sanraksha Kosh (RRSK)’

When it was created ?? 

As announced by Minister of Finance in his Budget Speech for 2017-18, a Fund namely ‘Rashtriya Rail Sanraksha Kosh (RRSK)’ has been created with a corpus of ₹1 lakh crore to be utilized over a period of five years for replacement, renewal and upgradation of critical safety assets. A provision of ₹20,000 crore has been made in 2018-19 out of ‘RRSK’ to fund essential works for ensuring safety.

LHB Coaches in Indian Railway -: 

Linke Hofmann Busch (LHB) design coaches are lighter in weight, have higher carrying capacity, higher speed potential, increased codal life and better safety features as compared to Integral Coach Factory (ICF) design coaches.
The passenger coaches plying over Indian Railways (IR) have been designed with the necessary safety features considering the operating conditions over IR. However, with a view to providing safer and more comfortable journey to passengers, it has been decided to replace conventional ICF design coaches of Mail/Express trains with LHB design coaches in a phased manner. 
It has also been decided that only LHB coaches would be manufactured by Production Units of IR from April 2018 onwards.
Anil Kakodkar Committee on Railway Safety -: 

  • The Committee notes that the ‘present environment on  Indian Railways reveals a grim picture of inadequate performance’ largely due to poor infrastructure and resources, and lack of empowerment at the functional level.
    • The financial state of Indian Railways is ‘at the brink of collapse’ unless some concrete measures are taken.  Passenger fares have not been increased in the last decade and the infrastructure is severely strained. All safety margins have been squeezed. This has led to a neglect of infrastructure maintenance.
    • In the present situation, the three vital functions (rule making, operations and the regulation) are all vested in the Railway Board. There is need for an independent mechanism for safety regulation. The Committee recommends the creation of a statutory Railway Safety Authority with enough powers to have a safety oversight on the operational mode of Railways.
    • The Research Design and Standards Organization (RDSO), the apex technical wing of the Railways, is highly constrained. This has hampered the ability of the system to internalize emerging technologies. The Committee recommends restructuring of RDSO for greater empowerment. It also recommends that a Railway Research and Development Council (RRDC) be set up directly under the government.
    • The Committee recommends the adoption of an Advanced Signalling System (akin to the European Train Control System) for the entire trunk route length of 19,000 km within 5 years. This is estimated to cost Rs 20,000 crore.
    • All Level Crossings (both manned and unmanned) should be eliminated over five years. An estimated expenditure of Rs 50,000 crore will be required for achieving this target. The Committee is of the belief that this amount will be recovered within 7-8 years through savings in maintenance costs and improved train operations.
    • The Committee also recommends a switch over from the ICF design coaches to the much safer LHB design coaches. This is likely to cost Rs 10,000 crore over the next five years.
    • Other Committee recommendations on the maintenance of safety related infrastructure are estimated to cost about Rs 20,000 crore.